CIG B5A3F3F881 – OUTCOME SUMMARY P24-329
P24- 329 – NEGOTIATED PROCEDURE RDO MEPA NO. 4920179 (already identified O.E.s by this Contracting Authority) – 32nd Stormo Amendola – C.E.206023/206123/206223 – SUPPLY OF MANHOLE COVERS, PIPES, WELLS, AND CHANNELS. .
CIG B5B7129B42 – OUTCOME EXTRACT P25-014
P25-014 – 36th STORMO GIOIA DEL COLLE – (ID 3836) – C.E. 203923 – Works for reclamation of the North-East area and demolition of disused buildings – Amount €1,967,212.77 (VAT included) – Chapter 7120/25 Financial Year 2024/2025. Request for exploratory market survey for site vehicle hire.
CIG B5C842DE79 – OUTCOME EXTRACT P25-005
P25-005 – NEGOTIATED PROCEDURE WITH ECONOMIC OPERATORS ALREADY SELECTED BY THE CONTRACTING AUTHORITY VIA RDO MEPA 505862 – GIOIA DEL COLLE ELECTRICAL SYSTEM ADJUSTMENT DM37/08 AT CLINIC N.31 OF P.G. – I.D.1610467 – CAP.4536/12 – E.F. 2025/26 – DECISION TO CONTRACT M_D ARM003 REG2024 0148937 23/12/2024.
CIG B49C8B778E – OUTCOME EXTRACT P24-306
P24-306 – DIRECT AWARD / TD MEPA 4797847 – BARI PALESE Q.G. CSAM – CONSTRUCTION OF SHOT-STOPPING STRUCTURES WITH COLLECTION OF PROJECTILES IN DEDICATED REAR CONTAINERS IN THE BALL-STOP ROOM OF THE BARI PALESE FIRING RANGE – 136 OF P.G. – Chap.7120/20 SMA Area – PIS 2024 – F.Y. 2024 – C.E.012424.
CIG B69BB0C0AD – EXTRACT OF RESULT P25-051
BARI – PALESE – SUBSCRIPTION FOR THE THREE-YEAR PERIOD 2025/27 FOR PUBLISHED PRODUCTS FROM GRUPPO 24 ORE CAP. 4539/06 – E.F. 2025.
CIGB5A6F2D608 – OUTCOME EXTRACT P24-272
AMENDOLA Rdo Mepa 4929623 – Supply of asphalt concrete at the Amendola (FG) Worksite – €680,251.20 DETERMINA M_D A7504A9 DE22024 0000043 OF 27/03/2024 – MINISTRY OF DEFENCE DIRECTORATE GENERAL OF WORKS – CIG B5A6F2D608 – CUP D75I23000310001 – BASE BID AMOUNT €680,251.20 EXCLUDING VAT
CIG B5CE96CB83 – OUTCOME EXTRACT P25-025
P25 – 025 – BARI – ROOF MAINTENANCE WORKS TO BE CARRIED OUT AT THE SCHOOLS COMMAND / 3rd R.A. PROJECT CODE 25001 PVA INFRASTRUCTURE SERVICE no.3/25.
CIG B609D14360 – OUTCOME EXTRACT P25-013
P25-013 – BARI PALESE – Processing of payroll for casual workers of the Field Engineering Group for the year 2025
CIG B60B5A9C83 – OUTCOME EXTRACT P25-029
P25-029 – AMENDOLA (FG) – EXECUTIVE DESIGN SERVICE (WITH ELEMENTS OF THE FEASIBILITY STUDY LEVEL) AND COORDINATION FOR SAFETY DURING THE DESIGN PHASE RELATED TO THE CONSTRUCTION OF THE LOW OBSERVABILITY LABORATORY – C.E. 010824 – RESOLUTION TO CONTRACT 0135772
CIG B34DA664FA – RESULT EXTRACT
P24-251 – GIOIA DEL COLLE – FUEL TANK CLEANING SERVICE