CIG B25B83B474

Protocollo Italia – Albania, aimed to strengthen collaboration in migration matters – Law 21.02.2024 n. 14 – Decree n. 47 dated 04.04.2024 – CC.EE. 183224 -183324 – Construction works for CPR and CT systems in Gjader and Shengjin sites – Construction works for foundations, equalization basins and steel-reinforced concrete overpasses in Gjader and Shengjin sites – Construction works for […]

CIG B19B56CAE4

Italy – Albania Protocol, aimed at strengthening cooperation on migration matters – Law 21.02.2024 n. 14 – Determination n. 47 of 04.04.2024 – CC.EE. 183224 -183324 – Works for the construction of CPR and CT at the Gjader and Shengjin sites – “Works for the construction of special systems at the Shengjin site”

CIG B259FD8491

Protocollo Italia – Albania, aimed at strengthening cooperation in the field of migration – Law 21.02.2024 n. 14 – Decree n. 47 of 04.04.2024 – CC.EE. 183224 -183324 – Construction works for CPR and CT at the sites of Gjader and Shengjin – “Works for the construction of special facilities at the Gjader site”

CIG B14070334A

MARTINA FRANCA (TA) – Direct assignment through requests for quotes from MEPA– Restoration of the plant
purification at the Trasconi site – EXECUTIVE DESIGN AND COORDINATION OF THE
SAFETY IN THE DESIGN PHASE – CHAPTER 1191/06

CIG B140723DAF

MARTINA FRANCA (TA) – Direct assignment through requests for quotes from MEPA– Restoration of the plant
purification at the Trasconi site – EXECUTIVE DESIGN AND COORDINATION OF THE
SAFETY IN THE DESIGN PHASE – CHAPTER 1191/06

CIG B400A1CA7B REVISED RESULTS OF THE RACE

MARTINA FRANCA (TA) – Direct assignment through requests for quotes from MEPA– Restoration of the plant
purification at the Trasconi site – EXECUTIVE DESIGN AND COORDINATION OF THE
SAFETY IN THE DESIGN PHASE – CHAPTER 1191/06

CIG B400A1CA7B REVISED RESULTS OF THE RACE

MARTINA FRANCA (TA) – Direct assignment through requests for quotes from MEPA– Restoration of the plant
purification at the Trasconi site – EXECUTIVE DESIGN AND COORDINATION OF THE
SAFETY IN THE DESIGN PHASE – CHAPTER 1191/06

CIG B26EA5A2F3 REVISED MATCH RESULT

Direct placement through comparison of MEPA quotes no. 4508726– P24-168 – AMENDOLA (FG) – CABINA
APP. REPAIR OF CABIN AND EQUIPMENT – Design costs (PSC, safety and coordination plan)
including)

CIG B1EFD2227E

PROCEDURE NEGOTIATED WITH O.O.E. THAT HAVE ALREADY BEEN SELECTED BY THE CONTRACTING AUTHORITY –
PANTELLERIA (TP) – Infrastructure and plant maintenance for the need to increase operational safety –
Waterproofing of the vaulting roofs of the North and South galleries – Hangar nr. 12 by P.G.

CIG B21EAAEE2A EXTRACT OF TENDER OUTCOME P24-108

PROCEDURE NEGOTIATED WITH O.O.E. THAT HAVE ALREADY BEEN SELECTED BY THE CONTRACTING AUTHORITY –
PANTELLERIA (TP) – Infrastructure and plant maintenance for the need to increase operational safety –
Waterproofing of the vaulting roofs of the North and South galleries – Hangar nr. 12 by P.G.