EXTRACT OUTCOME CIG B45E0B07E5
P24 309 – 36th WING GIOIA DEL COLLE – REMEDIATION WORKS NORTH-EAST AREA AND DEMOLITION OF DISUSED BUILDINGS - W.O. 203823 – CHAPTER 7120/25 F.Y. 2024 – DET 70 DATED 06/05/2024 – REMEDIATION WORK (OS 30) AND SAFETY WORK ON ELECTRICAL SUBSTATION NO. 331 OF […]
EXTRACT OF RESULTS CIG B12308501C
P23 280 – SANTERAMO IN COLLE (BA) – DESIGN CHARGES – STATIC AND FUNCTIONAL RESTORATION OF A METAL LATTICE TOWER, FUNCTIONAL RESTORATION OF SYSTEMS, PLASTERING AND ROOF WATERPROOFING OF THE GGEE BUILDING – C.E187122 CHAPTER 7120-20.
EXTRACT FROM RESULTS CIG B3A2FDA3B7
P24-273 - SIGONELLA - INVESTIGATIONS TO DETERMINE THE ACN/PCN COEFFICIENT AND EVALUATION OF THE LOAD-BEARING CAPACITY OF CONCRETE/BOUND MACADAM PAVEMENTS USING A HEAVY FALLING WEIGHT DEFLECTOMETER (HWD)
SUMMARY OF RESULTS CIG B267D42C06
P24-191 GIOIA DEL COLLE – DESIGN CHARGES FOR COMPLETION WORKS ON FLOORS 2 AND 3 OF THE NEW FLIGHT SQUADRONS COMMAND BUILDING – C.E. 252124 – ITEM 7120/20
EXTRACT OF RESULT CIG B32E0ABD6B
P24-176 – SAN GIOVANNI TEATINO – DESIGN CHARGES FOR WORKS TO ADAPT THE SUBBASE FOR THE REQUIREMENTS OF THE 133rd S.R.R. – CHAPTER 7120/20 – FINANCIAL YEAR 2024