Implementation works for functional testing – checks and verifications – 2 six-month periods (under pressure) of the water column stations (overhead and underground), with simultaneous verification of the water pipes (UNI 10779; EN 671-2; UNI 45&70), of the entire water pipe system connected to the water column system, including the maintenance of the pumps serving the system of the Munition and Armament Logistics Center of Orte (VT), P.G. n. 0 Sedime (reserved area plus logistics area)
Download the notice
Download the notice
Download the notice
Download the notice
Download the notice