Decision to contract – Alghero – Installation of air conditioning system on the 1st and 2nd Floor of Building 8 of P.G.

ALGHERO (SS) – Realizzazione impianto di condizionamento del 1° e 2° Piano del Fabbricato 8 di P.G.

Decision to contract – Alghero – Installation of air conditioning system on the 1st and 2nd Floor of Building 8 of P.G.

Download the notice