CIG A01628C5A4 EXTRACT OF RESULT P23-352

P23-352- SIGONELLA (CT) – EXECUTIVE DESIGN AND SAFETY COORDINATION DURING THE DESIGN PHASE, PREPARATION OF THE HYDRAULIC STUDY FOR THE MAINTENANCE OF THE GORNALUNGA RIVER DISCHARGES AND THE HYDRAULIC COMPATIBILITY STUDY FOR THE AUTHORISATION OF WORKS IN AREAS WITH HYDRAULIC HAZARD P3 OF THE P.A.I.

CIG A01628C5A4 EXTRACT OF RESULT P23-352